Home / California / San Francisco
Temporary fence rental
Temporary fence rental in San Francisco, CA.
A construction fence that uses a San Francisco sidewalk or parking lane needs a Public Works Street Space permit, which limits the work area to half the sidewalk width in front of the permitted property. Needing more room, such as when a 4-foot pedestrian path cannot be kept clear, takes an Additional Street Space permit, and Public Works says to allow at least 30 calendar days for it.
Sources: San Francisco Public Works - Street Space; San Francisco Public Works - Additional Street Space; San Francisco Public Works - Temporary Occupancy; San Francisco Public Works - Minor Encroachment Permit; SF.gov - Get a permit to close a street for a special event; SFMTA - Temporary Street Closure Request form; SFMTA - Special Event Street Closures permit conditions
Temporary fence rental companies serving San Francisco
Wilkinson Site Services (WP Site Services)
VerifiedSCS Fence (Security Contractor Services)
VerifiedWestern Site Services
VerifiedRentafence.com (WillScot)
VerifiedGood Events
VerifiedTC Rentals (Tri-California Events)
VerifiedPRO EM National Event Services
VerifiedGet quotes
Start a quote request here and finish it on the quote page. Requests are emailed to the FenceRentalHub team at [email protected].
What to have ready: how to request fence rental quotes.
Browse San Francisco by fence type
Planning guides: Construction fence rental · Event fence and crowd control · Temporary vs. permanent fence
Local rules in San Francisco
Permits
- Street Space permit (Public Works). San Francisco Public Works requires a Street Space permit for any occupancy of the public right-of-way for construction and other purposes. Material and equipment may not occupy more than 1/3 of the roadway width or more than 1/2 of the sidewalk width (Public Works Code Article 15, Section 724), and only along the frontage of the permitted property. Street space is charged at twenty-foot intervals under the Public Works fee schedule. You may not occupy the space until a street occupancy meeting has been held and the agreement signed, and tow-away signs must be posted at least 72 hours before the occupancy starts.
- Additional Street Space (ADS) permit. An ADS permit is needed if the Street Space area cannot leave a pedestrian path at least 4 feet wide, if you need the adjacent traffic lane (SFMTA may also require a Special Traffic Permit), if you need space in front of a neighboring property (written consent required), or if pedestrians must be diverted across the street. The site plan's traffic control elements may include fences and barricades. Allow at least 30 calendar days for processing; ADS permits are issued at one-month intervals for up to six months, and excavation is not allowed under them.
Source: San Francisco Public Works - Additional Street Space
- Short occupancies: Temporary Occupancy permit. Temporary Occupancy permits are generally issued for short-duration occupancy of the right-of-way, typically less than 7 days, and excavation is not allowed under them. Allow up to 5 business days for processing. A site plan must show a minimum 4-foot clear path of travel for pedestrians (6 feet in commercial/retail areas), and the fee is calculated per block face, per day.
- Permanent fences in the sidewalk are a different permit. A fence that extends past the property line into the public right-of-way as a long-term structure falls under a Minor Sidewalk Encroachment Permit, and Public Works says fences taller than three feet are typically not allowed under it. That permit is for long-term encroachments; temporary construction occupancy uses the permits above.
Source: San Francisco Public Works - Minor Encroachment Permit
- Special events and street closures. Street closures for special events go to ISCOTT (the Interdepartmental Staff Committee on Traffic and Transportation) through SFMTA. Applications for block parties and special events are due at least 30 days before the event; SF.gov suggests applying at least 3 months ahead for a new event and 6 months ahead for a large one, and lists the special-event street closure permit fee as $1,331 to $2,441 depending on how far ahead you apply. SFMTA does not supply barricades: event sponsors arrange them through a private vendor and/or San Francisco Public Works.
Sources: SF.gov - Get a permit to close a street for a special event; SFMTA - Temporary Street Closure Request form; SFMTA - Special Event Street Closures permit conditions
Before you dig (811). San Francisco is in USA North 811's service area (Northern California and Nevada). USA North 811's official site says to dial 811 or submit a request online before you dig, that calling 811 before digging is a legal requirement in California and Nevada, and that all excavation requests require a minimum of two working days' notice before excavation starts. This is for digging or driving posts, not for panels that sit on stands with no excavation.
Source: USA North 811
General information, not legal advice. Rules change; re-check the official page before you fence.
Pricing in San Francisco
No published local price list with firm figures was found for San Francisco. National guides give context only and are not a San Francisco survey: Angi (updated October 16, 2026) states a $350 average and a $150–$500 range for a one-month, 60-foot rental with delivery and installation; Fixr (updated January 31, 2025) states a $225 average and a $125–$450 range. Ask the listed companies for a quote on your address, footage, dates, gates, and screen. See the temporary fence rental cost guide.
National cost guides: Angi - How Much Does Temporary Fence Rental Cost?; Fixr - Temporary fence rental cost
Related guides and pages
- California temporary fence rental
- Temporary fence rental in San Jose
- Temporary fence rental in Los Angeles
- Chain-link panels
- Crowd-control barricades
- Privacy screens
- Temporary fence rental cost
- Temporary fence permits
- How to request quotes
- Construction fence rental
- Event fence and crowd control
- Temporary construction fence requirements
- Temporary fence height
- Temporary fence gates
- Get quotes
- Panels vs. in-ground temporary fence guide
San Francisco temporary fence rental FAQ
Do I need a permit for temporary fencing in San Francisco?
If the fence or any construction material occupies a sidewalk, parking lane or street, yes: San Francisco Public Works requires a Street Space permit for construction occupancy of the public right-of-way, and an Additional Street Space permit if you need more than the standard limits. Short occupancies, typically under 7 days, use a Temporary Occupancy permit. We did not find an official rule for a temporary fence that stays entirely on private property, so that case is not covered here. This is general information, not legal advice; confirm current rules with Public Works before installation.
How much of the sidewalk can a construction fence take in San Francisco?
Under a Street Space permit, material and equipment may use no more than half the sidewalk width (and no more than a third of the roadway width), only along the permitted property's frontage. If you cannot leave a pedestrian path at least 4 feet wide, you need an Additional Street Space permit, which Public Works says takes at least 30 calendar days to process.
How much does temporary fence rental cost in San Francisco?
No published local vendor price list with firm figures was found for San Francisco. Use the national cost guides as context only, and do not treat them as a San Francisco survey: Angi (updated October 16, 2026) states a $350 average and a $150–$500 range for a one-month, 60-foot rental with delivery and installation; Fixr (updated January 31, 2025) states a $225 average and a $125–$450 range. Ask the companies listed on this page for a quote on your address, footage, dates, gates, and screen. See the temporary fence rental cost guide.
Do I need to call 811 before installing temporary fence?
Yes, if posts will be driven or any digging will occur. San Francisco is served by USA North 811, whose official site says to dial 811 or submit a request online and that excavation requests need a minimum of two working days' notice before digging starts. Panels that sit on stands with no excavation are a different case; confirm with the installer. See the panels vs. in-ground guide.
How do I request quotes from companies on this page?
Call a listed company directly, or use Get quotes in the header or the form on this page. Quote requests are emailed to the FenceRentalHub team at [email protected]; they are not forwarded to rental companies automatically. The form does not promise a response time or a set number of quotes. See how to request quotes.
How do I request quotes?
Call the companies listed here directly, or use Get quotes in the header or the form on this page. Quote requests are emailed to the FenceRentalHub team at [email protected]; they are not forwarded to rental companies automatically.